Acts as a controller for a Dynamic Breakpoint on the workflow. and designed for use with a loop to break on specific iteration.
Add a Dynamic Breakpoint just before the Loop End, and configure the iteration variable used by the loop. By itself, the component does nothing. To control it, drop this Dynamic Breakpoint Controller on the workflow desktop but don't attach it to the workflow.
The Dynamic Breakpoint Controller can be configured (specify the name you have configured on the Dynamic Breakpoint it is to control).
Set the required iteration information about when to break, and then execute. This passes the information to the Dynamic Breakpoint. When the breakpoint halts, the Controller can be re-configured and re-executed to pass new instructions. After this, re-execute the Dynamic Breakpoint to continue until the next breakpoint is reached.
@takbb Brian Bates 31 October 2023
To use this component in KNIME, download it from the below URL and open it in KNIME:
Download ComponentDeploy, schedule, execute, and monitor your KNIME workflows locally, in the cloud or on-premises – with our brand new NodePit Runner.
Try NodePit Runner!Do you have feedback, questions, comments about NodePit, want to support this platform, or want your own nodes or workflows listed here as well? Do you think, the search results could be improved or something is missing? Then please get in touch! Alternatively, you can send us an email to mail@nodepit.com.
Please note that this is only about NodePit. We do not provide general support for KNIME — please use the KNIME forums instead.